-
01
Plant and service
Identify the installation: chemical plant, refinery, power station, steel mill, nuclear facility, waterworks, pipeline or other duty. State applicable project specifications and inspection requirements.
-
02
Process medium
Define fluid name, phase, concentration, solids content and whether it is corrosive, erosive, toxic, flammable or prone to crystallization. Provide design and operating temperature and pressure.
-
03
Materials and trim
Specify body/bonnet material, gate and stem materials, seat and sealing-face materials, packing and gasket. Medium compatibility, pressure and temperature are core quotation inputs.
-
04
Installation and operation
Confirm orientation, access, frequency of operation, closing time and available power. Use electric actuation where manual access is impractical; use a bevel gearbox when large size or differential pressure creates excessive handwheel torque, accepting longer operating time.
-
05
End connection
Flanged: easy removal and maintenance; widely used in process and utility systems. Butt-weld: permanent, high-integrity joints for high pressure, temperature, hazardous service or where external leakage paths must be minimized. Socket-weld: compact small-bore high-pressure piping. Threaded: small sizes and lower-risk utility service where permitted. Clamp or mechanical joints: specialized sanitary or water-service applications.
-
06
Standard and documentation
Provide nominal size, pressure class, design standard, face-to-face, flange or weld-end standard, testing standard, leakage class, NACE or low-temperature requirements, certificates, NDE, coating and documentation language.